| Quality Management System |
A documented quality system covering incoming materials, production, inspection, nonconformity handling and corrective action. |
ISO 9001:2015 certification may be used as supporting evidence, but the certificate should cover the relevant manufacturing scope and site. |
Valid certificate, certification body details, scope of certification, latest surveillance or recertification information, and internal quality procedures. |
Confirm the certificate through the certification body where possible. Review sample inspection records and trace one product from raw material receipt to final shipment. |
Required |
| Factory Legitimacy and Production Capacity |
The declared factory address, legal entity, production equipment and stated output should be consistent with the supplier’s quotation and audit information. |
Business registration and export documentation should identify the actual contracting and manufacturing entities. |
Business license, factory address, production-flow chart, equipment list, employee and shift information, and recent production capacity statement. |
Conduct a live video or on-site audit. Match signage, production lines, warehouse locations and production records with the submitted documents. |
Required |
| Material Traceability |
Critical components such as lock bodies, cylinders, springs, gears, circuit boards, batteries and fasteners should be traceable by lot or batch. |
Traceability is a core quality-control practice and should be defined in the manufacturer’s documented process. |
Approved supplier list, material specifications, incoming inspection reports, batch labels, certificates of conformity and nonconforming-material records. |
Select a finished product and trace its key components backward to the incoming inspection record and supplier batch information. |
Required |
| Dimensional and Mechanical Inspection |
Critical dimensions, keyway or latch geometry, mounting-hole positions, door-thickness compatibility and operating torque should be controlled against approved drawings. |
Use approved engineering drawings and defined tolerances. ISO 2859-1 may be used for lot-by-lot sampling plans; it does not automatically prescribe one universal AQL. |
Inspection drawings, gauge calibration records, first-article inspection report, control plan and sampling plan. |
Measure samples with calibrated calipers, gauges or torque instruments. Compare results with the approved drawing and record any deviations. |
Required |
| Cycle and Durability Testing |
The lock should meet the purchaser’s defined operating-cycle target without unacceptable wear, jamming, accidental release or loss of security function. |
There is no single universal cycle requirement for every password lock type. The target should be agreed in the product specification and verified by a repeatable test method. |
Durability test plan, test-machine calibration, cycle count, failure criteria, test photographs or videos and final test report. |
Witness a sample test or review recorded data. Confirm that the test uses representative loads, doors, batteries, passwords and environmental conditions. |
Required |
| Corrosion Resistance |
Metal finishes should resist corrosion under the environmental conditions expected in the target market, including indoor, humid or coastal applications. |
ISO 9227 defines neutral salt spray testing methods. Test duration and acceptance criteria must be specified by product finish and buyer requirement. |
Salt-spray test report, coating specification, substrate information, test duration, test temperature and acceptance criteria. |
Verify that the tested coating and substrate match the production version. Inspect samples for blistering, red rust and coating delamination according to the agreed criteria. |
Recommended |
| Environmental Protection |
Electronic password locks should be evaluated for dust and water exposure appropriate to their installation location. |
IEC 60529 defines IP Code ratings. The declared IP rating must correspond to the tested product configuration and enclosure. |
IP test report from a competent laboratory, product configuration, mounting instructions and rating declaration. |
Check whether the test sample includes the same seals, keypad, battery cover, cable ports and mounting arrangement as the production model. |
Recommended |
| Electronic and Electrical Safety |
Electronic models should include protection against abnormal operation, short circuit, incorrect installation and unsafe accessible parts. |
Applicable requirements depend on product design and market. IEC 62368-1 may apply to certain audio/video, information and communication technology equipment; it should not be assumed to cover every lock automatically. |
Electrical safety assessment, circuit diagrams, component approvals where applicable, abnormal-operation test records and risk assessment. |
Confirm the exact product scope with the testing laboratory or technical assessor. Review protective components and test results for the final production design. |
Required |
| Battery and Charging Safety |
Battery-powered locks should have defined low-battery warnings, polarity protection, charging controls where applicable and safe battery-compartment construction. |
For lithium batteries transported internationally, UN 38.3 testing is commonly required for transport compliance. Additional market-specific battery requirements may apply. |
Battery specification, safety data sheet, UN 38.3 test summary where applicable, charger specification and battery protection-circuit information. |
Check the battery model, protection circuit, charger output and labeling against the approved bill of materials and technical file. |
Required |
| Chemical and Restricted-Substance Control |
Materials, coatings, plastics, solder and electronic components should meet the chemical restrictions of the destination market. |
EU RoHS Directive 2011/65/EU, as amended, restricts specified hazardous substances in relevant electrical and electronic equipment. EU REACH Regulation (EC) No. 1907/2006 may also affect substances and articles. |
Supplier declarations, material declarations, laboratory test reports and a list of substances used in plating, plastics, adhesives and electronics. |
Match test samples with the production bill of materials. Request updated evidence when materials, suppliers or surface treatments change. |
Required |
| Firmware and Access-Control Security |
Electronic locks should provide controlled password enrollment, deletion, reset and user-permission management without relying on undocumented master credentials. |
Security requirements should be defined in a product threat model. For connected products, cybersecurity requirements may include secure update, authentication, access control and vulnerability handling. |
Security specification, password policy, reset procedure, firmware version control, vulnerability-response process and penetration-test summary where available. |
Test default credentials, failed-attempt behavior, reset authorization, audit-log handling, firmware update controls and data deletion procedures. |
Required |
| Functional and Failure Testing |
Every production lot should be checked for unlocking, locking, keypad or fingerprint response where applicable, emergency override, alarm behavior and battery indication. |
Use a written control plan with measurable pass/fail criteria. Safety-critical or security-critical functions should not rely only on visual inspection. |
End-of-line test procedure, test fixtures, test software version, pass/fail records and rejected-unit disposition records. |
Observe the complete end-of-line test. Verify that rejected units are segregated, reworked under authorization and retested before release. |
Required |
| Calibration and Measurement Control |
Instruments used for dimensional, torque, electrical, environmental and functional testing should be identifiable and within calibration validity. |
ISO 9001 requires monitoring and measuring resources to be suitable and controlled. Calibration traceability should be maintained where required by the measurement process. |
Calibration register, current calibration certificates, equipment identification labels and out-of-tolerance investigation records. |
Choose several instruments on the production floor and compare their identification numbers with the calibration register and certificates. |
Required |
| Final Inspection and Sampling |
Final inspection should verify appearance, dimensions, function, accessories, packaging, labeling and quantity before shipment. |
ISO 2859-1 provides statistically based attribute-sampling procedures for inspection by lot. The inspection level and AQL must be agreed with the buyer. |
Approved inspection standard, sampling plan, final inspection report, defect classification and shipment-release authorization. |
Compare the inspection report with randomly selected cartons and products. Confirm that critical defects are treated more strictly than minor cosmetic defects. |
Required |
| Packaging and Shipping Protection |
Packaging should protect the lock from impact, moisture, scratches, loose parts and battery-related shipping risks. |
Packaging and transport tests should reflect the shipping method, carton size, product weight and destination conditions. |
Packaging specification, carton drop or vibration test record where applicable, packing photographs and shipping marks. |
Inspect packed cartons, inner protection, accessory count, moisture protection, barcode or label accuracy and pallet stability. |
Recommended |
| Change Control |
No critical material, component, firmware, tooling, factory or process change should be made without documented review and approval. |
Change-control procedures should identify affected drawings, tests, approvals, inventory and customer notification requirements. |
Engineering-change procedure, change request forms, revision history, approved sample records and customer-notification policy. |
Review recent changes and confirm that revised components were revalidated before entering mass production. |
Required |
| After-Sales and Corrective Action |
The manufacturer should analyze complaints, warranty returns and field failures using documented root-cause and corrective-action methods. |
ISO 9001-based corrective-action practices commonly use documented nonconformity analysis, root-cause investigation, containment and effectiveness verification. |
Complaint log, return-rate data, 8D or equivalent corrective-action reports, replacement policy and spare-parts plan. |
Select a closed complaint and verify evidence of containment, root cause, corrective action and follow-up effectiveness. |
Recommended |
| Independent Pre-Shipment Inspection |
A pre-shipment inspection should confirm product conformity before balance payment or shipment release. |
Inspection scope should be based on the approved specification, sample plan and defect classification agreed in the purchase contract. |
Inspection checklist, random-sampling record, photographs, measurement results, function-test results and signed inspection report. |
Use random carton selection and verify product identity, quantity, appearance, dimensions, function, accessories, packaging and labeling. |
Recommended |